LAMP is located about 40 minutes outside of Houston, and can be accessed from Highway 90.
Liberty American Manufacturing Park (LAMP)
The next generation of American manufacturing - a master planned ecosystem designed to fast-track domestic production capabilities through strategic partnerships and unmatched infrastructure
Liberty American Manufacturing Park
Liberty American Manufacturing Park (LAMP)
The next generation of American manufacturing – a master planned ecosystem designed to fast-track domestic production capabilities through strategic partnerships and unmatched infrastructure
Inside the LAMP Project
LAMP focused on offering quick expansion of manufacturing footprint domestically for companies seeking to establish or enhance their American production capabilities with a complete unmatched infrastructure.
BaRupOn is committed to advancing and integrating sustainable power solutions across our operations. Our site currently supports multiple clean energy sources, including geothermal, natural gas, solar, and nuclear—ensuring reliable, efficient, and environmentally responsible energy for our facilities and community.
The park welcomes any interested parties domestic or international that have the same values, and want to be a part of the park.
4.5M +
Sq ft
45+
Foot Clearance
100+
Acres Paved
430+
MW Power
Powering America’s Clean Energy Future
LAMP (Liberty American Manufacturing Park) is a 638 acre infrastructure development designed for expanding the future in clean energy and manufacturing. The project has a commitment to energy resilience and sustainability. LAMP features a combined 1 GW energy system, 230 MW from natural gas and 200 MW from solar power.
Set 40 mins from Houston, location is not only ideal for logistics and supply chain access, but also emblematic of Texas’s evolving leadership in clean energy advancements.
LAMP is an immediate use marketing space that focuses on American production. Making this project a leading figure in the progress in innovation, energy resilience and economic growth.
Project Updates
BaRupOn’s project is a transformative initiative building a multi-source power and AI innovation hub that redefines America’s industrial future. Designed for resilience, scalability, and sustainability, it brings together power generation, advanced infrastructure, and intelligent systems to create a new benchmark for innovation and energy independence.
Why Choose LAMP
- 40 min from Houston
- Direct access to Highway 90
- Onsite transloading
- Proximity petrochemical hub
- Streamlined Permitting
- Manufacturing spaces available December 2025
- Manufacturing spaces provided on equity or JV basis
- Flexible 100,000 sq. ft
- All utilities included in partnership structure
- 4,500,000 sq. ft
- 45+ foot internal height clearance
- Advances steel frame construction
- 100+ acres of paved areas
- Temperature controlled class-A building